A Complex and Unprecedented Unloading
The Lake St Clair docked at the port of Caen after several days of navigation from the port of Libreville. The unloading operations began on the morning of October 14, under the supervision of SOGEMAR’s experienced teams. This veneer unloading required special attention due to the fragility and specific characteristics of the product.
The operation was completed on October 15 at noon, after a day and a half of work.